Before and After Project Photos

Road Ripping and Decompacting

Before: Compacted road surface prior to decommissioning
Before: Compacted road surface prior to decommissioning
After: The road bed has been hydraulically ripped to decompact the soil, improving infiltration and speeding revegetation
After: The road bed has been hydraulically ripped to decompact the soil, improving infiltration and speeding revegetation

Cross-Road Drain Installation

Before: Native surfaced seasonal road prior to decommissioning
Before: Native surfaced seasonal road prior to decommissioning
After: Road had been ripped (deocmpacted) and a cross-road drain has been installed to disperse runoff and prevent erosion
After: Road had been ripped (deocmpacted) and a cross-road drain has been installed to disperse runoff and prevent erosion
© 2024 Pacific Watershed Associates Inc. Contact design & development: accelerant