Headwaters Forest Bridge Installation (Part 2 of 2)

After: The bridge has been installed and the bare sideslopes mulched with straw to control erosion
After: The bridge has been installed and the bare sideslopes mulched with straw to control erosion
Two years after: Guard rails have been installed for pedestrians. The site is quickly revegetating with willow and groundcover.
Two years after: Guard rails have been installed for pedestrians. The site is quickly revegetating with willow and groundcover.
© 2024 Pacific Watershed Associates Inc. Contact design & development: accelerant